The second floor plan seen just above already had a dormer built out in back for a 3/4 bath which was gutted as seen before. We are expanding the closet and putting the door off the bedroom to the left instead of the hallway. The attic dormer in front gets insulated and finished for a toy room.
This side door gets removed and filled in and it will look something like what I have sketched below: The existing stud wall got removed and a header put in place for support and all the walls were framed! The kitchen wall sits back another 24" but with closing up the side door I gain about 8' of lineal cabinetry. The picture below is where my new back door will go as well as coats and washer/dryer niche.
2 comments:
Holy cow Mel! It is looking so awesome!! Wall frames up and everything!? That is so exciting. Great contractor guys you got! Great job on the demo....sorry about the water leaks!!
Totally impressed...as always!